Some short comings of the McWire design have shown themselves after the build.
The first one concerns the method of attaching the drive screw to the Z sled. I seems the constant pressure on the tape covered coupling nut made the tape move over time. It telescoped out until the holding pressure in the conduit ran out. Then slipped out of the strap.
The bracket material came from an L bracket that is used to hold drapery rods. A piece of 1/8"thick aluminum would do as well. It's held in place by 2 - #10 screws and tapped holes in the sled.
Another failure that has been occurring is breaking swing arms. They are not standing up to the task. I think it is the constant pressure of the spring and the size of the 5/16 hole plus counter sink relative to width of the swing arm. I have reduced the spring pressure as low as I fell comfortable with but failures are still occurring. I had 4 spares made when I ordered the laser cut parts and those are used up and now I am making parts to replace them.
I think the newly designed swing arms are working great and are easy to build. I used 3/16" press board because that’s what I had on hand. 1/4" thickness might be better. 1/8" aluminum would work nicely.
To make one of these :
- Use a template to mark the outline and hole locations.
- Cut it out roughly with the outline markings and the drill 1/16" pilot holes for all 3 holes. (larger for aluminum)
- Drill the clearance hole (23/64") for the 5/16" bolt holding it to the sled.
- Mount the bearing with a small washer (M5) under it using a dry wall screw.
- Screw in a #2 sheet metal screw to hold the spring.
- Dremel off the length the the screws protruding from the other side and grind them down just below the surface so the don't scratch the plastic on the sled.
- File the shape of the swing arm down to the outline marks.